Asana Google Sheets two-way sync: what can go back

Asana Google Sheets two way sync, field by field: which edits in a sheet go back to Asana, what stays read-only, and why CSV import can't update existing tasks.

Key takeaways

  • Asana's own tools are one-way: a CSV import only adds new tasks and never updates existing ones.
  • Asana to Sheets sends edits back on its Business plan, at $39 a month flat: name, notes, assignee, dates, section, completed state and custom fields.
  • Formula fields, created and completed dates, task links and logged time stay read-only.
  • Asana allows one assignee per task, and select fields only take options that already exist in Asana.
  • Unito also syncs both ways with a direction per field, and Zapier or Make can do it if you build the matching yourself.
Title card for the post: the title in white on the Asana to Sheets brand background, with asanatosheets.com/blog in the footer

Friday planning happens in the spreadsheet. Someone sorts 40 tasks by due date, pushes 6 of them a week, reassigns 3 and marks 2 done. Then the same person opens Asana and clicks through every one of those changes again.

An Asana Google Sheets™ two-way sync removes that second pass. Edit the cell, and the task in Asana changes too. This post covers which fields can travel back, which can't, and the Asana rules that shape what a sheet can do.

We checked fields and plans on 21 October 2026.

The short answer

Asana's own options are one-way. The CSV export goes out, and CSV import can only add new tasks. Asana's own Sync to Google Sheets only ever describes data flowing into the sheet.

To edit Asana tasks in Google Sheets and see the change in Asana, you need a third-party tool. Asana to Sheets, our Asana to Google Sheets add-on, does it on its Business plan, at $39 a month flat. It sends back the task name, notes, assignee, dates, a move to another section, the completed state and custom field values. Formula fields stay read-only. Unito also syncs both ways, and you can build Zapier or Make to do it.

Screenshot of the Asana to Sheets sidebar setting up a project sync: team and project pickers, When to sync set to Scheduled (every 3h), Direction set to One-way (Asana to Sheets), and toggles for custom fields, completed tasks, subtasks and a report

CSV import adds tasks and never updates them

The obvious idea is to export a CSV, edit it and import it again. Asana's import doesn't allow it.

Its help page on CSV import says it "will not update any existing tasks in the project." An import adds new tasks. Run the edited file back in and the project ends up with 2 copies of every row, the old task and a new one.

The import has other rules worth knowing. Due dates must be in US month/day/year format. Custom fields made by an import are local to that project. It's a fine way to load a list of new tasks once, and a dead end for edits.

Columns Asana accepts from the sheet

On the Business plan, your edits in these columns go back to Asana.

Column in the sheet Goes back to Asana What to know
Task name Yes Plain text
Notes Yes The task description
Assignee Yes One person only, because Asana allows one assignee
Start and due dates Yes Asana only keeps a start date when the task has a due date
Status (section) Yes Changing it moves the task to that section of the project
Completed Yes Marks the task done or reopens it
Text, number, currency, percentage fields Yes Typed values
Single-select, multi-select fields Yes Use options that already exist on the field in Asana
Date and people fields Yes A people field can hold more than one person
Reference fields Yes Custom fields, so they travel with the rest
Formula fields No Asana calculates them, so they're read-only everywhere

Here's how a planning session goes. Sort the tab by due date, push your 6 late tasks a week, put a new name in 3 assignee cells and mark 2 tasks done. Your team opens Asana on Monday and sees the new plan, with nobody retyping it.

The Status column needs a word. Asana has no built-in status. The column holds the task's section in that project, so typing a different section name moves the task on the board. If the project uses Asana's own Status field, that's a custom field and edits to it go back like any other.

Read-only columns

Some values describe history, and Asana won't take them from outside. Treat these columns as read-only.

  • The date someone created a task and the date they finished it
  • The task's link
  • Actual time logged, which comes from time entries
  • Formula fields
  • How many subtasks a task has

Tags, followers and the projects a task belongs to aren't in the two-way list. Change those in Asana.

Deleting rows isn't a way to delete tasks. Use Asana for that. Don't delete or rearrange columns in the synced tab either. Resizing and hiding columns are safe, and reports belong on a second tab.

Asana's rules shape what the sheet can do

A few limits come from Asana, and every two-way tool runs into them.

One assignee. Asana allows a single assignee per task. A cell with 2 names has nowhere to go. If more people share the work, put them in a people custom field, or add them as followers in Asana.

Existing options only. Someone in your workspace defined the options on each single-select and multi-select field. Type one of those options exactly. A new word in that cell won't create a new option in Asana.

Custom fields need a paid Asana plan. They're on Starter and above. Formula fields need Advanced or higher. On the free Personal plan, the two-way list shrinks to the task's own fields.

Asana paces every tool. It allows about 150 requests a minute on free workspaces and 1,500 on paid ones. A big batch of edits pushed at once can mean a short pause before the last ones land. Changes have their own cap of 15 at the same moment, covered in our post on Asana API limits.

Other ways to get two-way sync

Unito. Unito's Asana and Sheets integration syncs both ways, with the direction set per field. That's deeper than ours, and it suits a team that needs rules about which side wins on each field. Its prices aren't public. Unito counts each synced item twice, once per tool, and its plans update every 5 to 15 minutes. Its Google Sheets connector doesn't sync subtasks. The full comparison is in Asana to Sheets vs Unito.

Zapier or Make. Zapier has an Update Task action for Asana and a New or Updated Spreadsheet Row trigger. Make has 59 Asana actions and a Watch Changes trigger for Sheets. Joining them into a two-way sync means building the matching yourself, with a task ID column and a lookup step. On Zapier a run costs a task, and on Make it costs credits. It works for a narrow job, such as marking tasks done from a sheet. A whole project is a lot of wiring.

Coefficient and Coupler.io. Both pull Asana into Sheets for reporting. Coefficient's Asana page doesn't mention writing back.

Option Two-way Subtasks in the sheet Price
CSV export and import No, import adds only Parent Task column Free
Asana's own sync Not described Not documented Included in Advanced
Asana to Sheets Business plan Yes, with parent name $39 a month, flat
Unito Yes, per-field direction Not in the Sheets connector Shown in the app only
Zapier or Make If you build it Separate trigger Per task or credit

Frequently asked questions

Can I update Asana from Google Sheets without a paid tool?

Not with Asana's own tools. Its CSV import only adds new tasks, and its Sheets sync only describes data coming into the sheet. Zapier's free plan gives 100 tasks a month, enough to test a single update step.

Which plan of Asana to Sheets has two-way sync?

Business, at $39 a month or $390 a year, flat per account. It also includes live sync, so changes made in Asana show up in the sheet within seconds. There's a 7-day free trial with no credit card.

Can I edit formula fields in the sheet?

No. Asana calculates formula fields itself, so they're read-only in Asana and in the sheet. Change the inputs the formula uses and Asana updates the result.

Does deleting a row delete the task in Asana?

Deleting rows isn't a way to delete tasks, so delete them in Asana. Leave the columns of the synced tab in place too. Resizing and hiding them is safe.

Can I give a task 2 assignees from the sheet?

Asana allows one assignee per task, so the Assignee column takes one person. Put extra people in a people custom field, which does sync back, or add them as followers in Asana.

Try it on one project

Pick a project you replan in a spreadsheet every week. Sync it, change 3 due dates in the sheet, and check them in Asana. The Business plan and its trial are on the pricing page, and the other ways to sync Asana to Google Sheets sit side by side in our main guide.