The portfolio sheet looked fine for months. Then the team crossed 500 tasks, and the report started missing work that was plainly in Asana.
That's the Asana Google Sheets™ sync limit doing its job. Asana's own Sync to Google Sheets is a real feature, made by Asana and free on Advanced and up. It also has 4 limits that decide whether it fits: a 500-row cap, a plan gate at Advanced, a refresh every few hours and a locked tab.
This post covers what it does, how to set it up and where each limit bites. We checked the facts on Asana's help pages on 21 October 2026.
The short answer
Asana's Sync to Google Sheets sends a project, a portfolio or an advanced search into a Google Sheets file. It works through the Asana Exports add-on.
It needs Asana Advanced, Enterprise or Enterprise+. Advanced costs $24.99 per user per month billed annually. The cap is 500 rows. The data updates on its own every few hours, and Asana's help page states both hourly and 6-hourly. Nothing on the page describes edits going back to Asana.
If you already pay for Advanced and the project stays under 500 rows, use it. Past 500 rows, or on Personal or Starter, a Sheets add-on or another method fits better.

Inside Asana's Sync to Google Sheets
Asana's apps page lists the integration as made by Asana. Its one-line pitch is to "sync data from Asana projects and portfolios to Google Sheets."
The help page names 3 sources:
- Projects. One project's tasks in a sheet.
- Portfolios. A portfolio report with 3 tabs: Overview, Asana project data, and Live source data.
- Advanced search results. The results of an advanced search across projects, which is the nearest thing to a filtered export.
In the portfolio report, the Live source data tab is locked. Asana's help page says it is "locked to protect the connection to Asana." Your charts and formulas belong on the other tabs or a new one.
Don't mix this up with the other Asana add-on on the Google Workspace™ Marketplace, called simply Asana. That one adds smart chips, so you can @-mention an Asana task inside a sheet. It doesn't export data.
How to set up Asana's sync to Google Sheets
- Install the Asana Exports add-on from the Google Workspace Marketplace.
- In Asana, open the dropdown menu of the project or portfolio. Choose Export/Print, then Sync to Google Sheets.
- Copy the link Asana shows.
- In a Google Sheet, go to Extensions, Asana Exports, Sync with Asana.
- Paste the link and confirm.
For portfolios, Asana's apps page also lists the path Actions, Export, Google Sheets. The menu labels move between Asana's pages. Look for Export in the dropdown.
The 4 limits, one by one
| Limit | What Asana says | What it means for your report |
|---|---|---|
| Plan | Advanced, Enterprise and Enterprise+ only | Personal and Starter workspaces can't use it |
| Rows | "The current limit for syncing and exporting data is 500 rows." | A project with subtasks reaches 500 sooner than it looks |
| Refresh | Every 6 hours, and elsewhere on the page every hour | Don't promise a client numbers from a set hour |
| Locked tab | Live source data tab is locked | Build formulas and charts on a separate tab |
| Direction | Describes only data flowing into the sheet | Edits in the sheet stay in the sheet |
The plan gate
Advanced is $24.99 per user per month billed annually, or $30.49 monthly. Asana has no 1-seat plan, so the smallest Advanced team is 2 seats at $49.98 a month. A team of 10 pays $249.90 a month.
If you're on Advanced for portfolios, goals or time tracking already, the sheet sync costs nothing on top. If the sheet is the only reason to upgrade from Starter at $10.99, the upgrade is $14 per seat per month. On 10 seats that's $140 a month for one export.
The 500-row cap
500 rows covers a small project with ease. A busy one gets there fast. A project with 120 tasks and 3 subtasks each already sits near 480 rows, if subtasks count as rows. Asana's page doesn't say whether they do, so check your own sheet. A portfolio of 6 projects passes 500 quickly too.
Plan for 500 as a hard ceiling.
The refresh
Asana's help page says the sheet "will automatically update every 6 hours." A few lines on, it says the Live source data tab "automatically updates every hour." Both lines sit on that one help page.
Treat it as a background refresh every few hours. A Monday report is fine. A board people watch during a launch day isn't.